Posted by on August 24, 2017 at 6:31 pm
A fire drill was conducted on Thursday 24th August 2017 at Sg Bakap Factory. The emergency system (fire alarm) was activated around 8:30am without notification except the Emergency Rescue Team (ERT) members. It was assumed that the cause of the fire at warehouse. The entire employee were evacuated through their nearest exits and gathered at […]
Posted by on June 5, 2017 at 7:57 am
A fire drill at USG factory was conducted on Monday 5th June 2017; fire alarm was activated around 5:30pm without notification except the ERT members. It was assumed that the cause of the fire at packing. The entire employee were evacuated through their nearest exits and gathered at emergency assembly point. All ERT members monitored […]
Posted by on December 22, 2016 at 5:08 pm
A fire alarm was triggered without notification at 8.33am on 22nd Dec 2016 except the ESH members, it was assumed that the causes of fire at cutting department. All employees were evacuated by their nearest exit and assemble at the point on time (2 minutes 50 sec). All HOD updates their respective departments’ headcounts immediately […]
Posted by on March 16, 2016 at 8:36 am
On 16th March 2016 at 8.30am, a fire alarm was triggered without notification except the ESH members. It was assumed that the causes of fire at store area, alarm triggered manually. All employees were evacuated by their nearest exit and gather at Emergency Assemble Point. All ESH committee members monitor the situation and educate workers […]
Posted by on December 16, 2011 at 9:27 am
A fire alarm was triggered without notification at 3.30pm except the ESH members, it was assumed that the causes of fire were the electrical cross circuiting at the Mechanic Room. All employees were evacuated by their nearest exit. There was an fabricated fault and we have had purposely jamming the door lock, though the door […]